Inside RedNote's $2.2 Billion AI Data Center Plan and China's Trillion-Yuan Computing Push
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region. Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
Published byEdited with DeepSeek-V4-FlashImages generated with GPT Image 1.5
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region.
Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
The Horinger Data Center Cluster already has 291,000 petaflops of computing capacity, over 80% powered by renewable energy, making Inner Mongolia a natural hub for energy intensive AI infrastructure.
RedNote (Xiaohongshu) is planning a US$2.2 billion, 600-megawatt data centre in Inner Mongolia's Ulanqab region as part of China's broader AAI-generated visual representing RedNote's planned data center in Inner Mongolia.
AI Prompt
Create a landscape editorial hero image for this Studio Global article: RedNote (Xiaohongshu) is planning a US$2.2 billion, 600-megawatt data centre in Inner Mongolia's Ulanqab region as part of China's broader A. Article summary: RedNote's 600 MW, US$2.2 billion data centre in Ulanqab is one of many hyperscale AI infrastructure projects clustering in Inner Mongolia's renewable-energy-rich corridor. It is enabled by a national policy environment t. Topic tags: general, news, general web, user generated, government. Style: premium digital editorial illustration, source-backed research mood, clean composition, high detail, modern web publication hero. Use reference image context only for broad subject, composition, and topical grounding; do not copy the exact image. Avoid: logos, brand marks, copyrighted characters, real person likenesses, fake screenshots, UI text, readable text, watermar
openai.com
RedNote (Xiaohongshu), the Chinese lifestyle social media platform preparing for a public listing, is building a massive AI data center in Inner Mongolia's Ulanqab region. The US$2.2 billion, 600-megawatt (MW) facility is one of dozens of hyperscale computing projects clustering in this renewable-energy-rich corridor, and it sits inside a broader national push — anchored by the 15th Five-Year Plan — to build a unified computing network backed by trillions of yuan in investment .
Key Details of RedNote's Planned Facility
Budget & scale: approximately US$2.2 billion (roughly 15 billion yuan), excluding semiconductor costs, for a 600 MW facility .
Studio Global AI
Continue your research
This page includes a source-backed answer you can continue inside Studio Global.
What is the short answer to "Inside RedNote's $2.2 Billion AI Data Center Plan and China's Trillion-Yuan Computing Push"?
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region.
What are the key points to validate first?
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region. Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
What should I do next in practice?
The Horinger Data Center Cluster already has 291,000 petaflops of computing capacity, over 80% powered by renewable energy, making Inner Mongolia a natural hub for energy intensive AI infrastructure.
Inside RedNote's $2.2 Billion AI Data Center Plan and China's Trillion-Yuan Computing Push
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region. Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
Published byEdited with DeepSeek-V4-FlashImages generated with GPT Image 1.5
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region.
Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
The Horinger Data Center Cluster already has 291,000 petaflops of computing capacity, over 80% powered by renewable energy, making Inner Mongolia a natural hub for energy intensive AI infrastructure.
RedNote (Xiaohongshu) is planning a US$2.2 billion, 600-megawatt data centre in Inner Mongolia's Ulanqab region as part of China's broader AAI-generated visual representing RedNote's planned data center in Inner Mongolia.
AI Prompt
Create a landscape editorial hero image for this Studio Global article: RedNote (Xiaohongshu) is planning a US$2.2 billion, 600-megawatt data centre in Inner Mongolia's Ulanqab region as part of China's broader A. Article summary: RedNote's 600 MW, US$2.2 billion data centre in Ulanqab is one of many hyperscale AI infrastructure projects clustering in Inner Mongolia's renewable-energy-rich corridor. It is enabled by a national policy environment t. Topic tags: general, news, general web, user generated, government. Style: premium digital editorial illustration, source-backed research mood, clean composition, high detail, modern web publication hero. Use reference image context only for broad subject, composition, and topical grounding; do not copy the exact image. Avoid: logos, brand marks, copyrighted characters, real person likenesses, fake screenshots, UI text, readable text, watermar
openai.com
RedNote (Xiaohongshu), the Chinese lifestyle social media platform preparing for a public listing, is building a massive AI data center in Inner Mongolia's Ulanqab region. The US$2.2 billion, 600-megawatt (MW) facility is one of dozens of hyperscale computing projects clustering in this renewable-energy-rich corridor, and it sits inside a broader national push — anchored by the 15th Five-Year Plan — to build a unified computing network backed by trillions of yuan in investment .
Key Details of RedNote's Planned Facility
Budget & scale: approximately US$2.2 billion (roughly 15 billion yuan), excluding semiconductor costs, for a 600 MW facility .
Studio Global AI
Continue your research
This page includes a source-backed answer you can continue inside Studio Global.
What is the short answer to "Inside RedNote's $2.2 Billion AI Data Center Plan and China's Trillion-Yuan Computing Push"?
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region.
What are the key points to validate first?
RedNote (Xiaohongshu) is planning a 600 MW, US$2.2 billion AI data center in Ulanqab, Inner Mongolia, joining DeepSeek and over 80 other projects in the region. Ulanqab had signed 84 data center projects as of end 2025, 81 of them AI computing centers, with total planned investment exceeding 500 billion yuan.
What should I do next in practice?
The Horinger Data Center Cluster already has 291,000 petaflops of computing capacity, over 80% powered by renewable energy, making Inner Mongolia a natural hub for energy intensive AI infrastructure.
Location: Ulanqab city or its western districts in Inner Mongolia, a region chosen for abundant wind and renewable energy resources .
Purpose: to support RedNote's AI computing needs; the platform has been preparing for a public listing and is scaling infrastructure accordingly .
Broader context in Ulanqab: as of end-2025, Ulanqab had signed 84 data center projects (81 of them AI computing centers) with total planned investment exceeding 500 billion yuan . DeepSeek is also reportedly planning a 1 GW AI data center in the same area .
Ulanqab Is Becoming China's AI Data Center Capital
Ulanqab has rapidly emerged as a preferred location for energy-intensive AI infrastructure. The Horinger Data Center Cluster, which spans Hohhot and Ulanqab, already has 291,000 petaflops of total computing capacity, with over 80% powered by renewable energy . In the first quarter of 2025 alone, power consumption of data centers within the cluster reached 1.22 billion kWh, with 84.57% supplied by renewables .
The region has also launched innovative infrastructure projects like the integrated source-grid-load-storage data center, which combines wind and solar power generation with intelligent transmission and energy storage, consuming 2.19 billion kWh of clean electricity annually .
National Context: The 15th Five-Year Plan and the Computing Network Push
RedNote's data center is not an isolated project. It is enabled by a sweeping national policy environment that has elevated AI computing infrastructure to a strategic priority:
NDRC's 4 trillion yuan projection: At a July 31, 2026 press briefing, NDRC spokesperson Jiang Yi stated that China's computing power networks are expected to receive 4 trillion yuan (~US$589 billion) in new direct investment during the 15th Five-Year Plan period (2026–2030) .
Policy backbone: The 15th Five-Year Plan outline, released in March 2026, calls for deepening the "East Data, West Computing" project and building a "multi-level computing power infrastructure system and a national integrated computing power network" .
Strategic elevation: In April 2026, China's Politburo elevated computing networks to the same strategic tier as water networks and power grids, classifying AI infrastructure as national strategic infrastructure under the "Six Networks" blueprint . The Six Networks initiative commits over 7 trillion yuan in annual investment across six critical network categories, including computing power .
Private investment expected: The NDRC has noted that computing infrastructure investment comes mostly from enterprises, creating major room for private investment in the sector .
What This Means for RedNote and China's AI Race
RedNote's data center investment comes as the platform prepares for an initial public offering . Scaling AI computing capacity is critical for social media and e-commerce platforms that increasingly rely on machine learning for content recommendation, search, and advertising.
But the broader story is about China's determination to build a unified national computing network — a digital infrastructure layer that can rival the scale of water or power grids. With 4 trillion yuan in direct investment expected through 2030, and the Politburo treating compute as strategic infrastructure, projects like RedNote's 600 MW facility in Ulanqab are likely the first of many .
Survey on the Current State of the 'Token Capital'
Location: Ulanqab city or its western districts in Inner Mongolia, a region chosen for abundant wind and renewable energy resources .
Purpose: to support RedNote's AI computing needs; the platform has been preparing for a public listing and is scaling infrastructure accordingly .
Broader context in Ulanqab: as of end-2025, Ulanqab had signed 84 data center projects (81 of them AI computing centers) with total planned investment exceeding 500 billion yuan . DeepSeek is also reportedly planning a 1 GW AI data center in the same area .
Ulanqab Is Becoming China's AI Data Center Capital
Ulanqab has rapidly emerged as a preferred location for energy-intensive AI infrastructure. The Horinger Data Center Cluster, which spans Hohhot and Ulanqab, already has 291,000 petaflops of total computing capacity, with over 80% powered by renewable energy . In the first quarter of 2025 alone, power consumption of data centers within the cluster reached 1.22 billion kWh, with 84.57% supplied by renewables .
The region has also launched innovative infrastructure projects like the integrated source-grid-load-storage data center, which combines wind and solar power generation with intelligent transmission and energy storage, consuming 2.19 billion kWh of clean electricity annually .
National Context: The 15th Five-Year Plan and the Computing Network Push
RedNote's data center is not an isolated project. It is enabled by a sweeping national policy environment that has elevated AI computing infrastructure to a strategic priority:
NDRC's 4 trillion yuan projection: At a July 31, 2026 press briefing, NDRC spokesperson Jiang Yi stated that China's computing power networks are expected to receive 4 trillion yuan (~US$589 billion) in new direct investment during the 15th Five-Year Plan period (2026–2030) .
Policy backbone: The 15th Five-Year Plan outline, released in March 2026, calls for deepening the "East Data, West Computing" project and building a "multi-level computing power infrastructure system and a national integrated computing power network" .
Strategic elevation: In April 2026, China's Politburo elevated computing networks to the same strategic tier as water networks and power grids, classifying AI infrastructure as national strategic infrastructure under the "Six Networks" blueprint . The Six Networks initiative commits over 7 trillion yuan in annual investment across six critical network categories, including computing power .
Private investment expected: The NDRC has noted that computing infrastructure investment comes mostly from enterprises, creating major room for private investment in the sector .
What This Means for RedNote and China's AI Race
RedNote's data center investment comes as the platform prepares for an initial public offering . Scaling AI computing capacity is critical for social media and e-commerce platforms that increasingly rely on machine learning for content recommendation, search, and advertising.
But the broader story is about China's determination to build a unified national computing network — a digital infrastructure layer that can rival the scale of water or power grids. With 4 trillion yuan in direct investment expected through 2030, and the Politburo treating compute as strategic infrastructure, projects like RedNote's 600 MW facility in Ulanqab are likely the first of many .
Survey on the Current State of the 'Token Capital'